Features Overview
UNIVERISTY OF SOUTH ALABAMA PRESS TOWER - MOBILE, AL
Construction of a four level stadium press tower. Project included 2 each stair towers and a 4 elevator shear-wall system. Further included composite slabs on metal decks and CIP multi-level seating.
PASCAGOULA HS PERFORMING ARTS CENTER - PASCAGOULA, MS
TGC provided labor to form, place and finish concrete a multi-level 7,500 square foot stage and orchestra pit in a fully enclosed facility
Feature 3
Integer tempus, elit in laoreet posuere, lectus neque blandit dui, et placerat urna diam mattis orci. Nulla eu pretium massa. Donec eu est non lacus lacinia semper.